{"id":2008,"date":"2026-04-27T14:41:27","date_gmt":"2026-04-27T12:41:27","guid":{"rendered":"https:\/\/certipower.be\/kennisbank\/fast-charger-on-your-business-site-when-is-50-kw-dc-sensible-and-when-is-it-overkill\/"},"modified":"2026-10-07T21:16:35","modified_gmt":"2026-10-07T19:16:35","slug":"fast-charger-on-your-business-site-when-is-50-kw-dc-sensible-and-when-is-it-overkill","status":"publish","type":"kennisbank","link":"https:\/\/certipower.be\/en\/kennisbank\/fast-charger-on-your-business-site-when-is-50-kw-dc-sensible-and-when-is-it-overkill\/","title":{"rendered":"A fast charger on your business site: 50 kW or 200 kW, and when is it overkill?"},"content":{"rendered":"<div class=\"cpk\">\n<p class=\"cpk-lead\">A 50 kW DC fast charger typically costs \u20ac25,000 to \u20ac45,000 including installation. A 200 kW charger costs several times more.<\/p>\n<p>Both cost several times as much as a standard 22 kW AC charger. Below is an honest answer to the question of which power makes sense, and when.<\/p>\n<h2>What does 50 kW do, and what does 200 kW do?<\/h2>\n<p>An electric car with a usable battery of 60 kWh charges from 20% to 80% in:<\/p>\n<div class=\"cpk-timeline\">\n<div class=\"cpk-tl\"><span class=\"cpk-tl-date\">AC 11 kW<\/span><strong>\u00b1 3.5 hours<\/strong><span class=\"cpk-tl-sub\">From 20% to 80%<\/span><\/div>\n<div class=\"cpk-tl is-now\"><span class=\"cpk-tl-date\">DC 50 kW<\/span><strong>\u00b1 45 minutes<\/strong><span class=\"cpk-tl-sub\">From 20% to 80%<\/span><\/div>\n<div class=\"cpk-tl is-next\"><span class=\"cpk-tl-date\">DC 200 kW<\/span><strong>\u00b1 15 minutes<\/strong><span class=\"cpk-tl-sub\">If the car can take that power<\/span><\/div>\n<\/div>\n<p>Two caveats: not every car accepts 200 kW, and peak power is rarely reached across the whole charging session.<\/p>\n<div class=\"cpk-callout\">\n<p>The difference only matters when time is truly scarce.<\/p>\n<\/div>\n<h2>Three situations where DC pays for itself<\/h2>\n<div class=\"cpk-qs\">\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">01<\/div>\n<div class=\"cpk-q-body\">\n<h3>Customer car park with charging as a traffic driver<\/h3>\n<p>Hotels, restaurants and retail with customers who drive electric. Your customer stays half an hour to an hour anyway.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> 50 kW is enough. 200 kW only makes sense at transit locations along an access road or motorway.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">02<\/div>\n<div class=\"cpk-q-body\">\n<h3>Operational fleet with intensive use<\/h3>\n<p>Courier services, taxis and transport companies whose vehicles charge several times a day. Here every minute counts.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> 200 kW is defensible, provided the vehicles can actually take that power.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">03<\/div>\n<div class=\"cpk-q-body\">\n<h3>Back-up for unexpected situations<\/h3>\n<p>A large fleet that mainly runs on home chargers, but where someone occasionally needs to move on quickly.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> one 50 kW DC charger as a back-up, not as the main infrastructure.<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>Three situations where DC is overkill<\/h2>\n<div class=\"cpk-pillars\">\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">Employee fleet<\/span><strong>Cars parked overnight<\/strong><span class=\"cpk-pillar-txt\">12 hours of downtime: 11 kW AC is more than enough.<\/span><\/div>\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">Visitor car park<\/span><strong>Low frequency<\/strong><span class=\"cpk-pillar-txt\">A few charging sessions a day do not justify a \u20ac30,000 investment. A 22 kW AC charger does the same for less.<\/span><\/div>\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">SME<\/span><strong>Irregular need<\/strong><span class=\"cpk-pillar-txt\">A 22 kW AC charger or a compact 25 to 30 kW DC charger covers most of the need, at a fraction of the price.<\/span><\/div>\n<\/div>\n<div class=\"cpk-cta-mini\">\n<div class=\"cpk-cta-mini-txt\"><strong>Unsure whether a fast charger makes sense?<\/strong><span>Our technical advisor calculates whether the investment pays for itself.<\/span><\/div>\n<div class=\"cpk-cta-mini-act\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/schedule-a-call\/\">Get the calculation<\/a><\/div>\n<\/div>\n<h2>The forgotten middle class: DC 25 to 30 kW<\/h2>\n<p>Compact DC chargers at around \u20ac15,000 to \u20ac20,000 are an underrated category. Fast enough for an effective top-up over lunch (60% in 30 minutes), affordable enough for an SME budget. For sites that want to charge quickly now and then without paying for 50 kW, it is often the ideal compromise.<\/p>\n<h2>The grid capacity trap<\/h2>\n<p>A 50 kW DC charger needs at least 75 kVA of connection capacity for that charger alone. A 200 kW charger needs several hundred kVA, and in practice often its own medium-voltage substation with the matching permit. Many existing SME connections cannot handle that without a grid upgrade.<\/p>\n<p>Always include that cost and lead time in the business case. What to do when capacity is tight: <a href=\"https:\/\/certipower.be\/en\/kennisbank\/charging-infrastructure-in-an-existing-car-park-what-if-grid-capacity-is-too-limited\/\">charging infrastructure in an existing car park<\/a>.<\/p>\n<h2>The right power, in four rules<\/h2>\n<ol class=\"cpk-steps\">\n<li><strong>Default: AC<\/strong>For cars that stand still long enough.<\/li>\n<li><strong>In-between: DC 25 to 30 kW<\/strong>For sites that want to charge quickly now and then.<\/li>\n<li><strong>50 kW: with a demonstrable reason<\/strong>Commercial or operational.<\/li>\n<li><strong>200 kW: only where throughput is the product<\/strong>And where the grid connection can handle that capacity.<\/li>\n<\/ol>\n<p>An installer who recommends a fast charger without that distinction is selling you margin rather than a solution. The basics are covered in <a href=\"https:\/\/certipower.be\/en\/kennisbank\/ac-vs-dc-charging-when-do-you-truly-need-a-fast-charger\/\">AC or DC charging<\/a>.<\/p>\n<div class=\"cpk-feats\">\n<div class=\"cpk-feat cpk-ic-plug\"><strong>Install<\/strong><span>AC and DC, from home charger to fast charger on the company site.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-meter\"><strong>Measure<\/strong><span>Consumption per user and per location, without estimates.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-chart\"><strong>My.Certipower<\/strong><span>Consumption and costs per user and per location, without Excel.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-bill\"><strong>Split billing<\/strong><span>Your employee pays nothing upfront and submits no receipts. <a href=\"https:\/\/certipower.be\/en\/services\/split-billing\/\">How split billing works<\/a><\/span><\/div>\n<\/div>\n<div class=\"cpk-cta\">\n<div class=\"cpk-eyebrow\">No obligation<\/div>\n<p class=\"cpk-cta-title\">Which power suits your site?<\/p>\n<p>We calculate whether a fast charger pays for itself for you.<\/p>\n<ul class=\"cpk-checks\">\n<li>Analysis of charging needs and downtime<\/li>\n<li>Check of the grid capacity on your site<\/li>\n<li>Business case with investment and payback<\/li>\n<\/ul>\n<div class=\"cpk-cta-actions\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/schedule-a-call\/\">Schedule a call<\/a><a class=\"cpk-btn cpk-btn-ghost cpk-btn-tel\" href=\"tel:+3251153015\">+32 51 15 30 15<\/a><\/div>\n<div class=\"cpk-cta-alt\">Prefer email? <a href=\"mailto:sales@certipower.be\">sales@certipower.be<\/a><\/div>\n<div class=\"cpk-proof\">\n<div><strong>6.000+<\/strong><span>charging points<\/span><\/div>\n<div><strong>98%<\/strong><span>customer satisfaction<\/span><\/div>\n<div><strong>7\/7<\/strong><span>support<\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A DC fast charger is expensive. When does 50 kW pay for itself, when do you really need 200 kW, and when is AC simply enough?<\/p>\n","protected":false},"template":"","meta":{"_acf_changed":false,"slim_seo":{"title":"Fast charger on your site: 50 kW or 200 kW?","description":"A DC fast charger is expensive. When does 50 kW pay for itself, when do you really need 200 kW, and when is AC simply enough?","facebook_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg","twitter_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg"},"_slim_seo_primary_term_kennisbank_categorie":0},"kennisbank_categorie":[45],"class_list":["post-2008","kennisbank","type-kennisbank","status-publish","hentry","kennisbank_categorie-products"],"acf":[],"_links":{"self":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank\/2008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank"}],"about":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/types\/kennisbank"}],"wp:attachment":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/media?parent=2008"}],"wp:term":[{"taxonomy":"kennisbank_categorie","embeddable":true,"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank_categorie?post=2008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}