{"id":2012,"date":"2026-04-27T14:41:27","date_gmt":"2026-04-27T12:41:27","guid":{"rendered":"https:\/\/certipower.be\/kennisbank\/ev-fleet-transition-a-12-month-roadmap-for-hr-and-facility\/"},"modified":"2026-10-07T21:16:35","modified_gmt":"2026-10-07T19:16:35","slug":"ev-fleet-transition-a-12-month-roadmap-for-hr-and-facility","status":"publish","type":"kennisbank","link":"https:\/\/certipower.be\/en\/kennisbank\/ev-fleet-transition-a-12-month-roadmap-for-hr-and-facility\/","title":{"rendered":"EV fleet transition: a 12-month roadmap for HR and facility"},"content":{"rendered":"<div class=\"cpk\">\n<p class=\"cpk-lead\">Electrifying a fleet is not a one-month project. If you underestimate lead times, you get stuck.<\/p>\n<div class=\"cpk-callout\">\n<p>Underestimated lead times are the most common cause of failed EV projects.<\/p>\n<\/div>\n<div class=\"cpk-timeline\">\n<div class=\"cpk-tl is-now\"><span class=\"cpk-tl-date\">Month 1 to 3<\/span><strong>Decide<\/strong><span class=\"cpk-tl-sub\">Analysis, scenarios and a new car policy.<\/span><\/div>\n<div class=\"cpk-tl is-next\"><span class=\"cpk-tl-date\">Month 3 to 6<\/span><strong>Test<\/strong><span class=\"cpk-tl-sub\">Charging infrastructure at the office and a pilot with five employees.<\/span><\/div>\n<div class=\"cpk-tl\"><span class=\"cpk-tl-date\">Month 6 to 12<\/span><strong>Roll out<\/strong><span class=\"cpk-tl-sub\">Scaling up, full rollout and evaluation.<\/span><\/div>\n<\/div>\n<h2>The roadmap, step by step<\/h2>\n<ol class=\"cpk-steps\">\n<li><strong>Month 1 to 2: analysis and vision<\/strong>Map the current fleet, commuting per employee and charging needs at the office versus at home. Work out three scenarios (fast, phased, cautious) with the TCO over 4 years. Management decides at the end of month 2.<\/li>\n<li><strong>Month 2 to 3: adapt the car policy<\/strong>Electric only for new leases? Hybrid as a transition? Which models, what budget? Social consultation and signing of the new car policy at the end of month 3.<\/li>\n<li><strong>Month 3 to 4: design office charging infrastructure<\/strong>Site visit with the installer, capacity analysis with the grid operator and a permit application where needed. For sites with more than 8 charging points, allow several months for a heavier grid connection.<\/li>\n<li><strong>Month 4 to 6: pilot with the first five employees<\/strong>The first five EV drivers get their car, their home charger and access to the charge point management platform. Goal: test every administrative process, from split billing to charging cards and reimbursement. Fixing mistakes is cheaper here than in month 10.<\/li>\n<li><strong>Month 6 to 9: scaling up<\/strong>Every month, 5 to 10 electric cars are added. A home installation takes 3 to 8 weeks per unit, so plan through a shared schedule with the installer. For every new car: 30 minutes of explanation about the charging card, app and split billing.<\/li>\n<li><strong>Month 9 to 11: full rollout<\/strong>The remaining employees get their electric car. The company car park is fully operational. First-line support moves from fleet to the charge point management platform.<\/li>\n<li><strong>Month 12: evaluation and adjustment<\/strong>Evaluate the average charging cost per kWh, the share of home versus public charging, employee satisfaction and intervention lead times. Adjust the policy based on real data, which you now actually have.<\/li>\n<\/ol>\n<div class=\"cpk-cta-mini\">\n<div class=\"cpk-cta-mini-txt\"><strong>Want to build your own roadmap?<\/strong><span>We go through the 12 months with you and create a plan tailored to your company.<\/span><\/div>\n<div class=\"cpk-cta-mini-act\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/schedule-a-call\/\">Schedule a call<\/a><\/div>\n<\/div>\n<h2>The three most underestimated delays<\/h2>\n<div class=\"cpk-qs\">\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">01<\/div>\n<div class=\"cpk-q-body\">\n<h3>The grid connection<\/h3>\n<p>With a grid upgrade, this can take up to 6 months. If capacity on your site is tight, read <a href=\"https:\/\/certipower.be\/en\/kennisbank\/charging-infrastructure-in-an-existing-car-park-what-if-grid-capacity-is-too-limited\/\">what to do when grid capacity is too limited<\/a>.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> start the capacity analysis in month 3, not at installation.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">02<\/div>\n<div class=\"cpk-q-body\">\n<h3>The permit for a medium-voltage substation<\/h3>\n<p>If a new substation is needed for the charging infrastructure, your schedule also depends on the permit.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> treat the permit as a critical path, not an afterthought.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">03<\/div>\n<div class=\"cpk-q-body\">\n<h3>Social consultation on the car policy<\/h3>\n<p>Without a signed car policy, the rollout does not start. The questions to answer upfront are covered in <a href=\"https:\/\/certipower.be\/en\/kennisbank\/drafting-an-internal-charging-policy-8-questions-you-must-answer-in-advance\/\">drafting an internal charging policy: 8 questions<\/a>.<\/p>\n<div class=\"cpk-q-do\"><strong>How to approach it:<\/strong> start consultation during the analysis phase, so the policy is ready by month 3.<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>One partner, from analysis to evaluation<\/h2>\n<p>Certipower installs, measures, manages and bills. At the employee\u2019s home, on the company site and on the road, in one monthly invoice to the employer.<\/p>\n<div class=\"cpk-feats\">\n<div class=\"cpk-feat cpk-ic-plug\"><strong>Install<\/strong><span>At the employee\u2019s home, on the company site and on the road.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-meter\"><strong>Measure<\/strong><span>Consumption per user and per location, without estimates.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-bill\"><strong>Split billing<\/strong><span>Your employee pays nothing upfront and submits no receipts. <a href=\"https:\/\/certipower.be\/en\/services\/split-billing\/\">How split billing works<\/a><\/span><\/div>\n<div class=\"cpk-feat cpk-ic-chart\"><strong>My.Certipower<\/strong><span>Consumption, costs and KPIs per user and per location, without Excel.<\/span><\/div>\n<\/div>\n<p>Reimbursement is covered in <a href=\"https:\/\/certipower.be\/en\/kennisbank\/reimbursement-of-employee-charging-costs\/\">reimbursement of employee charging costs<\/a>. Our full approach is under <a href=\"https:\/\/certipower.be\/en\/solutions\/fleet-hr\/\">Fleet and HR solutions<\/a>.<\/p>\n<div class=\"cpk-cta\">\n<div class=\"cpk-eyebrow\">No obligation<\/div>\n<p class=\"cpk-cta-title\">What does your transition look like?<\/p>\n<p>We go through the 12-month approach with you and give you a concrete plan.<\/p>\n<ul class=\"cpk-checks\">\n<li>Analysis of your fleet and charging needs<\/li>\n<li>Schedule with the critical lead times<\/li>\n<li>A proposal with costs and savings in euros<\/li>\n<\/ul>\n<div class=\"cpk-cta-actions\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/schedule-a-call\/\">Schedule a call<\/a><a class=\"cpk-btn cpk-btn-ghost cpk-btn-tel\" href=\"tel:+3251153015\">+32 51 15 30 15<\/a><\/div>\n<div class=\"cpk-cta-alt\">Prefer email? <a href=\"mailto:sales@certipower.be\">sales@certipower.be<\/a><\/div>\n<div class=\"cpk-proof\">\n<div><strong>6.000+<\/strong><span>charging points<\/span><\/div>\n<div><strong>98%<\/strong><span>customer satisfaction<\/span><\/div>\n<div><strong>7\/7<\/strong><span>support<\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>From first decision to a fully electric fleet in 12 months. The roadmap step by step.<\/p>\n","protected":false},"template":"","meta":{"_acf_changed":false,"slim_seo":{"title":"EV fleet transition: a 12-month roadmap","description":"From first decision to a fully electric fleet in 12 months. The roadmap step by step.","facebook_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg","twitter_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg"},"_slim_seo_primary_term_kennisbank_categorie":0},"kennisbank_categorie":[36],"class_list":["post-2012","kennisbank","type-kennisbank","status-publish","hentry","kennisbank_categorie-hr-fleet"],"acf":[],"_links":{"self":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank\/2012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank"}],"about":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/types\/kennisbank"}],"wp:attachment":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/media?parent=2012"}],"wp:term":[{"taxonomy":"kennisbank_categorie","embeddable":true,"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank_categorie?post=2012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}