{"id":2017,"date":"2026-04-27T14:41:27","date_gmt":"2026-04-27T12:41:27","guid":{"rendered":"https:\/\/certipower.be\/kennisbank\/what-does-it-cost-to-install-a-charging-station-in-2026\/"},"modified":"2026-10-07T21:16:28","modified_gmt":"2026-10-07T19:16:28","slug":"what-does-it-cost-to-install-a-charging-station-in-2026","status":"publish","type":"kennisbank","link":"https:\/\/certipower.be\/en\/kennisbank\/what-does-it-cost-to-install-a-charging-station-in-2026\/","title":{"rendered":"What does it cost to install a charging station in 2026?"},"content":{"rendered":"<div class=\"cpk\">\n<p class=\"cpk-lead\">\u201cWhat does a charging station cost?\u201d is the most asked and worst answered question in this sector. The answer depends entirely on what is included.<\/p>\n<p>The charger, the installation, fuse box modifications and smart features together determine the price.<\/p>\n<h2>The four cost components<\/h2>\n<div class=\"cpk-qs\">\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">01<\/div>\n<div class=\"cpk-q-body\">\n<h3>The charger itself<\/h3>\n<p>\u20ac600 to \u20ac2,500 for AC chargers, depending on brand, power and smart features.<\/p>\n<div class=\"cpk-q-do\"><strong>Key takeaway:<\/strong> \u20ac600 is a basic model without an app, \u20ac2,500 a top model with app, RFID, monitoring and PV integration.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">02<\/div>\n<div class=\"cpk-q-body\">\n<h3>The installation<\/h3>\n<p>\u20ac400 to \u20ac1,200, depending on the distance between fuse box and charger, the type of mounting (post or wall charger) and the complexity of the cable routing: digging or not, wall penetrations.<\/p>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">03<\/div>\n<div class=\"cpk-q-body\">\n<h3>Fuse box modifications<\/h3>\n<p>\u20ac200 to \u20ac1,500. Adding a residual current device is cheap. Upgrading the circuit or switching from single-phase to three-phase can reach \u20ac1,500 or more.<\/p>\n<div class=\"cpk-q-do\"><strong>Key takeaway:<\/strong> the latter goes through the grid operator, Fluvius or ORES, with a lead time of 4 to 8 weeks.<\/div>\n<\/div>\n<\/div>\n<div class=\"cpk-q\">\n<div class=\"cpk-q-nr\">04<\/div>\n<div class=\"cpk-q-body\">\n<h3>Smart or additional features<\/h3>\n<p>PV coupling, a management platform subscription, dynamic load balancing: on average \u20ac100 to \u20ac300 per year, or a one-off extra cost of \u20ac200 to \u20ac500.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<h2>Four worked examples<\/h2>\n<div class=\"cpk-timeline cols-4\">\n<div class=\"cpk-tl is-now\"><span class=\"cpk-tl-date\">Individual, standard<\/span><strong>\u20ac1,500 to \u20ac1,800<\/strong><span class=\"cpk-tl-sub\">Single-phase, charger next to the fuse box. The scenario for 60% of Belgian homes.<\/span><\/div>\n<div class=\"cpk-tl is-now\"><span class=\"cpk-tl-date\">Individual with solar panels<\/span><strong>\u20ac2,200 to \u20ac2,800<\/strong><span class=\"cpk-tl-sub\">Three-phase, smart charger with solar integration, 8 metres of cable.<\/span><\/div>\n<div class=\"cpk-tl is-next\"><span class=\"cpk-tl-date\">Individual, complex<\/span><strong>\u20ac3,500 to \u20ac4,800<\/strong><span class=\"cpk-tl-sub\">Garage at the back of the garden, 25 metres of buried cable, circuit upgrade, smart charger.<\/span><\/div>\n<div class=\"cpk-tl\"><span class=\"cpk-tl-date\">SME with 6 charging points<\/span><strong>\u20ac18,000 to \u20ac28,000<\/strong><span class=\"cpk-tl-sub\">Including load balancing, management platform and main cabling.<\/span><\/div>\n<\/div>\n<p>For the SME, that comes to \u20ac3,000 to \u20ac4,700 per charging point. That is more than for an individual, because infrastructure, monitoring and grid management are included. Current market prices are in <a href=\"https:\/\/certipower.be\/en\/kennisbank\/what-does-a-charging-station-really-cost-in-2026-the-certipower-price-barometer-q2\/\">the Certipower price barometer<\/a>.<\/p>\n<div class=\"cpk-cta-mini\">\n<div class=\"cpk-cta-mini-txt\"><strong>A concrete price for your situation?<\/strong><span>Not a \u201cfrom\u201d price, but a total amount you can count on.<\/span><\/div>\n<div class=\"cpk-cta-mini-act\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/request-a-quote\/\">Request a quote<\/a><\/div>\n<\/div>\n<h2>What to watch for in quotes<\/h2>\n<p>Three costs are typically hidden:<\/p>\n<div class=\"cpk-pillars\">\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">\u201cFrom\u201d prices<\/span><strong>Charger only<\/strong><span class=\"cpk-pillar-txt\">Without installation.<\/span><\/div>\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">Subscription<\/span><strong>After year 1<\/strong><span class=\"cpk-pillar-txt\">A management platform that only starts charging later.<\/span><\/div>\n<div class=\"cpk-pillar\"><span class=\"cpk-lbl\">Grid connection<\/span><strong>\u20ac0 to \u20ac1,500<\/strong><span class=\"cpk-pillar-txt\">Through Fluvius or ORES, depending on the situation.<\/span><\/div>\n<\/div>\n<div class=\"cpk-callout\">\n<p>Always ask for a total price, with explicit mention of which costs are <em>not<\/em> included.<\/p>\n<\/div>\n<h2>What changes in 2026?<\/h2>\n<p>Grants for individuals have been cut sharply compared to 2023 and 2024. An overview per region is in <a href=\"https:\/\/certipower.be\/en\/kennisbank\/wallonia-flanders-brussels-regional-charging-grants-in-2026-compared\/\">regional charging grants in 2026 compared<\/a>. For companies, the tax treatment of charging infrastructure depends on the situation. Have your accountant check it.<\/p>\n<p>Want to use the charger smartly against the capacity tariff? Read <a href=\"https:\/\/certipower.be\/en\/kennisbank\/capacity-tariff-and-smart-charging\/\">capacity tariff and smart charging<\/a>.<\/p>\n<h2>One partner, one total price<\/h2>\n<p>Certipower installs, measures, manages and bills. At home, on the company site and on the road.<\/p>\n<div class=\"cpk-feats\">\n<div class=\"cpk-feat cpk-ic-plug\"><strong>Install<\/strong><span>Charger, installation and fuse box in one quote.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-meter\"><strong>Measure<\/strong><span>Consumption per user and per location, without estimates.<\/span><\/div>\n<div class=\"cpk-feat cpk-ic-bill\"><strong>Split billing<\/strong><span>Your employee pays nothing upfront and submits no receipts. <a href=\"https:\/\/certipower.be\/en\/services\/split-billing\/\">How split billing works<\/a><\/span><\/div>\n<div class=\"cpk-feat cpk-ic-chart\"><strong>My.Certipower<\/strong><span>Consumption and costs per user and per location, without Excel.<\/span><\/div>\n<\/div>\n<div class=\"cpk-cta\">\n<div class=\"cpk-eyebrow\">No obligation<\/div>\n<p class=\"cpk-cta-title\">What does a charging station cost for you?<\/p>\n<p>We review your situation and give you a total price.<\/p>\n<ul class=\"cpk-checks\">\n<li>Charger, installation and fuse box in one price<\/li>\n<li>Explicit mention of what is not included<\/li>\n<li>For your home, your business or both<\/li>\n<\/ul>\n<div class=\"cpk-cta-actions\"><a class=\"cpk-btn cpk-btn-primary cpk-btn-arrow\" href=\"https:\/\/certipower.be\/en\/request-a-quote\/\">Request a quote<\/a><a class=\"cpk-btn cpk-btn-ghost cpk-btn-tel\" href=\"tel:+3251153015\">+32 51 15 30 15<\/a><\/div>\n<div class=\"cpk-cta-alt\">Prefer email? <a href=\"mailto:sales@certipower.be\">sales@certipower.be<\/a><\/div>\n<div class=\"cpk-proof\">\n<div><strong>6.000+<\/strong><span>charging points<\/span><\/div>\n<div><strong>98%<\/strong><span>customer satisfaction<\/span><\/div>\n<div><strong>7\/7<\/strong><span>support<\/span><\/div>\n<\/div>\n<\/div>\n<p class=\"cpk-note\">The prices in this article are indicative, include installation and are based on the market at the time of publication. Your actual price depends on your situation on site.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>What does a charging station really cost? The full cost breakdown, with examples for individuals and businesses.<\/p>\n","protected":false},"template":"","meta":{"_acf_changed":false,"slim_seo":{"title":"Charging station installation cost in 2026","description":"What does a charging station really cost? The full cost breakdown, with examples for individuals and businesses.","facebook_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg","twitter_image":"https:\/\/certipower.be\/wp-content\/uploads\/2026\/10\/certipower-deelafbeelding.jpg"},"_slim_seo_primary_term_kennisbank_categorie":0},"kennisbank_categorie":[41],"class_list":["post-2017","kennisbank","type-kennisbank","status-publish","hentry","kennisbank_categorie-costs"],"acf":[],"_links":{"self":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank\/2017","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank"}],"about":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/types\/kennisbank"}],"wp:attachment":[{"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/media?parent=2017"}],"wp:term":[{"taxonomy":"kennisbank_categorie","embeddable":true,"href":"https:\/\/certipower.be\/en\/wp-json\/wp\/v2\/kennisbank_categorie?post=2017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}